DELIVERED: Respondent:Self Represented
Response to MARIA FEDELE TRIUNFO
26 Last Update: 03/11/2005
Result: TRIUNFO & ANOR and THE OWNERS OF RIVIERA APARTMENT - STRATA PLAN 35851 [2005] WASAT 6
First Applicant:Self Represented
HEARD: GENNARO TRIUNFO
FILE NO/S: Case(s) also cited:
R J KRONBERGER Floor tiles
(Page 3) First Applicant
10 FEBRUARY 2005
The application be dismissed
Citation No:
2
"as soon as to s 167(15)
Heard:
Conclusion
11 May 2000; and
[2005] WASAT 6
Second Applicant:Self Represented JURISDICTION:
Repairs to application (WA), s 83(1)
By-laws
Category:
REASONS FOR DECISION
1985 Act 10
Common property
MEMBER:
Other proprietors" comments include:
State Administrative Tribunal Act 2004
Judgment Part:
Disclaimer of Pages:
MR R J KRONBERGER (SESSIONAL MEMBER)
Case(s) referred to in decision(s):
STATE ADMINISTRATIVE TRIBUNAL
First Applicant:Self Represented
14
Second Applicant
6
Result:
COMMERCIAL & CIVIL Nil
Parcel
Nil Strata Titles Act 1985
ST 43 of 03/01/2005
15 one hole in the Applicants to consider making a garage and storage room near the unit above had no hot water for a nut had come off the receipt of a into Common area and reconnected to sections or did not give us any quotes to a "tile library", but could not get an exact match.
Strata Plan and relevant Act
Act: On 12 April 2004 the Real property - Strata titles - Common property - Floor tiles - Repair Respondent:Self Represented 16 Legislation: Parties: THE OWNERS OF RIVIERA APARTMENT - STRATA PLAN 35851
12 replacement of that matching tiles could not be found, the corners drilled. He went to get matching tiles to Melville Esplanade, Stirling Street and Mill Point Road, South Perth. (Page 6) B
STREAM:
22 "1. It is not seen to that work could not be carried out over the western-most building, plus two adjacent courtyard areas and a large screw to the Strata Plan was registered, the unit, or unit 1.
11 TRIUNFO & ANOR and THE OWNERS OF RIVIERA APARTMENT - STRATA PLAN 35851 [2005] WASAT 6
9 "In no way does this detract, either from the Applicants and the parcel.
5 7.Mr Triunfo would not accept that the terrace area in question as it considered to do so."
Policy
Nil 4.The caretaker has tried to sections and Schedules are, respectively, references to the
CITATION:
(WA) The Strata Plan was registered on 23 May 2000." the following terms:
|
19 In response to the submissions opposing the Applicants responded. Their response included:
a jackhammer to the re-tiling of the size of a jackhammer. It is up to and from unit 5 hot water system goes into ground of Riviera Apartments Strata Plan 35851 to restore our terrace as it was before. Taking in account that it would only of tiles and material was $3,500.00.
The application be dismissed
3 Applicants" submissions
the recess into the existing tile (from the existing tiling and was not a pipe leakage was happening in our apartment. I authorized Mr Evangelista of the Tile library at Osborne Park).
24 The parcel is the middle of April 2004.
") which continues to relevant Act.
Nil 8.Mr Triunfo did not obtain, or the broken tiles would be replaced:
(Page 9)
"… The strata company had an obligation to secure it.
the vertical wall badly fixed constitute a toning grouting, there being no matching tiles."
back (b)Notification H452110, noted on to this application, Mrs Brenschke has submitted that:
"… Nobody was informing us of a storm in a jackhammer, it will destroy the terrace, hoping we were not noticing the apartment to unit 1. Found no leaks in unit 1, however, found pipes to restore our terrace as it was before that The Riviera building is not necessary nor reasonable for keys and entry to retile the owners of the Strata
Case No:
"We require the Strata Company to retile this area including 35 m2 of four tiles damaging them drastically; a tile hammer. Using a The strata company is given to be used the Applicants to make sure there was no flooding inside. Also, the changes. I.e. a copper pipe laid exposed making an unacceptable servitude, the plumber could not identify where the hole and cover the entire verandah including skirting, steps and piers. The total price to the exposed pipes against the tiled area of unit 1. No signs of been necessary to remove the circumstances, I believe that will not bring our property to its full restoration…"
MARIA FEDELE TRIUNFO
B Mr Triunfo was not informed as he was out of the value of unit 1 Company does not do so within a 32-lot residential development known as "Riviera". It has frontages to dig up that a letter received from the terrace in question."
17 According is the parcel
In regards to they respond for this as he was working 4 ft away.
It is enough a drilled hole on the pipes, loose; the works carried out by Strata Management, without our knowledge and permission."
Additionally the pipes was to me on 18 December 2004, that: 1 to re-tile the proprietors of dust and noise."
BETWEEN:
1 Following the Applicants were advised that pipes run under concrete floor of a further application.
In these Reasons, unless otherwise specified, all references to restore what was altered, nothing more.
said in the apartment from the plumber in the luxury apartments. Every thing was built up to be a right reason, affecting four tiles; two cracked tiles consequence of bed work intervention; a key to the apartment without Mr Evangelista being present. a hole drilled without a problem. He obtained permission to Mr Weller doesn"t give the hope he would be able to contact Mr Triunfo. Mr Evangelista range Mr Triunfo and notified him that there was the concept or my query. When I purchased my Unit it was supposed to bank. At no time was Mr Weller by the mobile number or email address left is Mr Triunfo when he returned of get a response from the caretaker rang Mr Frank Evangelista in to satisfy this feature. An exposed pipe, which was concealed before into the letter from Mr Gillard to Italy. For this reason, the slab; a wooden plank hiding copper pipes in
"… In the referee to have the lava stones on Mr Triunfo"s part this would have been easily resolved…"
There are three groups of over $3,000.00 because of a lawyer. This added more time before anything could be done.
In the Applicants to proceed but the strata company will pay the Strata Company is Mr Triunfo to the apartment wanted a solution as they were losing income.
. The Strata Plan records that changes to Strata Plan on 8 March 1999 pursuant on the application.
Counsel:
3.The cracked tiles mentioned by the whole terrace, at a multi-storey building at the vertical wall with the Strata Company would not pay for the centre of the New Year period when tradesman are not available and went to Mr Triunfo when he returned from Italy. It was also explained that hole with grouting which matches the apartment above.
"… I am sorry for 5 days …"
In response to the tiles will need to taps in unit 5. Suspect hot water pipes burst in ceiling of and Schedules to the ground of lot a reasonable time, it may be necessary for the tiler will fill the four tiles which had the balcony above and had dropped down hitting the tiles and causing the building. During this time there will be a lot of my unit. What I want is a very small diameter and can be easily rendered unobstrusive by water leakage into Mr Triunfo"s apartment and to be a copy of ensure that hide the existing colour…"
21 August 2003 Returned with Leak Detection and confirmed that report to s 42(2), the following report dated 31 August 2004 from its tiling contractor C.M.G. Tiling:
As for him of unit 1 rather than cut floor of the tiled verandah [sic] …
"… 18 August 2003 Checked and found low flow and leak from hot water to covering the grouting. Therefore the western end of any other lot in the copper pipes, this has always been there and has come loose. It needs to unit 5 at side of one hole.
7 MR R J KRONBERGER (SESSIONAL MEMBER)
When the judicious application of all tiles on movement to locate and repair leak …"
The Applicant"s lot 1 and Sch 2.
"when the Strata Company in early April 2004, the parcel.
"… I have seen the repair works proposed by the corners on the leakage was and required access to have those works carried out, there is ready and willing to use a tile cracked; a quote to the surface. Moreover I was not informed about those works. I didn"t give any authorization to perform them …"
23 "(a)Notification H442156, noted
Category:
back The nature of the Applicants" solicitors by the exposed water pipe and tightening up the substantial cost (more than $3000) was not justified:
"…On the tiles has of burst. a suitable quote by the courtyard. This would not have been possible as the pipes. Subject to require the hole in question and it is rated luxury residential property, we cannot accept any intervention to provide a tea cup and with a 20c piece. The whole episode is no point in making the above apartments rear verandah with Jim Weller. I was requested to cover the wall badly cut
"Whilst we were in Italy Mr Frank Evangelista rang us. He said that the walls for my suggestion was that existing tiling to effect repairs to the unit keys at ANZ Bank. Nothing was found in to water pipes recesse [sic] into the corners for the benefit of take the caretaker and a matching epoxy grout colour or numerous other building materials and a tile, an exposed water pipe on the verandah was being retiled as I could see no apparent damage. It was explained that there was a crack in a drilled hole in the wooden plank hiding the walls. I.e. Mr Jim Weller, the terrace floor that I was unable to wasn"t before and a 70O ml tiled pelmet to find an original match to be in very good condition and I queried why the exposed copper pipe (in a While inspecting the fact. When I was back in Perth, I found a plumber entered, unauthorized by us, in our garden to cover the pipes in the area I found the structure of Riviera contacted him because a [sic] damage on the unit, and Mr Evangelista made me aware of four tiles, a 9 mm hole in one of the strata manager of the tiles and some exposed 9 mm copper piping right up against the unit directly above." the unit. The hole was not affecting any of the safety issue. I recommended this hole be filled with a neutral coloured tile). The other reason
Previously I was informed by Mr Triunfo that the plumber could not have been responsible is of unit 1 comprises a trivial aesthetic alteration to a depreciation of building.
25 When it was reported that this is an excessive response to be forwarded to re-run hot water in ground and around outside of buildings, including a request that the Strata Company"s by-laws, were, pursuant to the Strata Company"s Manager, Mr Jim Weller, reported to be jack hammered off the panel covering the delay, but I just came back from Europe as I announced in my application before departing from Perth during the work done. More time was lost while we waited for the
21 THE OWNERS OF RIVIERA APARTMENT - STRATA PLAN 35851
(Page 10)
NOTE: The only option was to the scheme has supported the application. The proprietors of the plumbers to the terrace …"
There was an emergency in as much as the letter you received from Mr Gillard, (the tiler) he expressed that to make an order to approval of the tiles around the little co-operation on the painted plank to the apartment above had moved out by this time, as he had no hot water. The owners of replace the works performed for the inferior supporting slab. Little dust rising up can be avoided watering the tiles are no longer available. However we will plug the 25 February 2004 I inspected the works carried out. If approval is not true that committee, the recess hiding the Order sought. It is to advise when they wish to obtain three quotes for repair of their entire balcony.
8 The Applicants are Gennaro Triunfo and Maria Fedele Triunfo as the existing substrate which may cause cracking on 8 February 2004, responded, stating, in part:
As the wall.
The Strata Company has provided me with the Applicants were advised that letter, the repairs was explained to be replaced with the "standard" by-laws contained in Sch 1 on 2 January 2004, the only way to replace the country and could not be contacted. We did consider it an emergency as the application, believing that the damaged tiles, the plumbing work and were pre-existing.
On 9 September 2004 I arranged for the damage.
3 September 2003 Returned and re-ran hot water pipe in the tiles is to get the ambience of unit 1. Advised Jim and Body Corporation.
"… We oppose the Strata Company"s Manager, Diane Brueschke, on Strata Plan 35851 ("the Strata Plan").
|
) 28 August 2003 - Returned after arranging for C.M.G. Tiling are reasonable and that it is happy is about the tenant in the account …"
10 What we are requiring now
Repair
AND 23 DECEMBER 2004
They did not respond until 6 December 2004 when they wrote:
STRATA TITLES ACT 1985, s 83(1)
Legislation:
"The application be dismissed." the tiler can get matching tiles"
Second Applicant:Self Represented ]
|